富津市, 日本
12.9 miles (20.7 km) · 2,291 ft elevation gain · Loop · trail · Route
| Distance | 12.9 mi (20.7 km) |
| Elevation gain | 2,291 ft (698 m) |
| Average gain | 178 ft per mile (34 m per km) |
| Longest climb | 4.1 mi, 1,004 ft of gain |
| Steepest climb grade | 70.6% |
| Runnable | 70% of the route |
| Climbs / descents | 2 climbs, 2 descents |
| Profile shape | Rolling |
| Difficulty score | 7.3 of 100 |
| Surface | trail |
| Route shape | Loop |
| Type | Route |
| Grade band | Share of route |
|---|---|
| Flat | 21% |
| Mild uphill | 21% |
| Moderate uphill | 11% |
| Steep uphill | 9% |
| Mild downhill | 20% |
| Moderate downhill | 9% |
| Steep downhill | 10% |
Nokogiriyama Commuting Route (Japan) has 2,291 ft (698 m) of elevation gain over 12.9 miles (20.7 km). That averages 178 ft of gain per mile.
The difficulty score for Nokogiriyama Commuting Route (Japan) is 7.3 of 100. That is harder than 62.5% of routes at a similar distance. About 70% of the route is runnable at typical trail effort; the rest is steep enough that most runners hike.
The longest climb on Nokogiriyama Commuting Route (Japan) runs 4.1 miles (6.6 km) and gains 1,004 ft (306 m). The steepest climb grade on the route is 70.6%.
Preview this trail in 3D flyover, view the elevation profile, and explore the segment breakdown.
View full route details →